CDM 2015 - The ΒιΆΉΤΌΕΔ Approach

Guidance on the practical application of the Construction (Design and Management) Regulations 2015 across the ΒιΆΉΤΌΕΔ

Updated: 12 April 2024

The ΒιΆΉΤΌΕΔ and CDM - a proportionate approach

The ΒιΆΉΤΌΕΔ recognises that CDM can apply to many of its activities from large events such as Proms in the Park to the smallest of construction related tasks e.g. changing a door handle on the set of Doctors. Both these activities carry an element of construction risk, however the level of risk presented is vastly different. Given these two extremes, it is not realistic to adopt a 'one size fits all' approach. Neither is it possible to provide specific guidance for every scenario across the ΒιΆΉΤΌΕΔ.

The ΒιΆΉΤΌΕΔ approach is to broadly classify its CDM related activity into three categories; Large Construction Related Projects, Medium Construction Related Projects, & Small Construction Related Tasks. Each of these categories will carry a certain level of construction β€˜risk’, the level of CDM planning and management required by the ΒιΆΉΤΌΕΔ should be in proportion to the level of risk identified.

To assist those planning activities where CDM may apply, the ΒιΆΉΤΌΕΔ has looked at 9 projects /productions (A-I on the diagram) and has made suggestions on how the requirements of CDM could be managed for those projects. This is based on our 'Wedge of Effort' model, which in basic terms shows that the greater the level of risk a project / production carries, the greater the 'effort' required in terms of planning and resource allocation.

A triangle showing the growth of small to large construction tasks requiring a sliding scale of documentation, from a risk assessment right up to a full traditional CDM paperwork.
The 'Wedge of Effort' approach to CDM 2015.

Large Construction Related Projects

Examples of large construction related projects would include productions on the scale of DIY SOS "the big build" (G) ΒιΆΉΤΌΕΔ Drama's, To Walk Invisible (H) and Proms in the Park (I)

All these projects would be considered relatively high risk in terms of construction risk and require thorough planning. DIY SOS could be considered a traditional construction project and therefore would require a traditional CDM approach. This would involve appointing appropriate dutyholders for example Principal Contractors and Principal Designers and the production of a Client Brief, Pre Construction Information, Construction Phase Plan & Safety File.

Example Construction Arrangements from DIY SOS are shown in the Useful Documents Section of this page.

A production like To Walk Invisible poses a slightly different set of challenges as it involves both some elements of traditional construction as well as a large 'set build in a fairly remote location.

Proms in the Park does not fit into the idea of traditional construction, however the construction element of the event would need to be considered as part of the initial business plan. Duty Holders would still need to be appointed and appropriate plans drawn up. These plans would normally form part of the overall event action plan. Further details are provided in the Event Safety Guide.

The application of CDM to these productions is discussed in greater detail in the Large Construction Related Projects document  (Useful Documents Section)

Medium Construction Related Projects

Examples of medium construction related projects would include set builds for productions at Roath Lock (D) or other drama village locations, temporary constructions on location for example the Antiques Road Show (E), or the erection of several camera towers for an FA Cup tie on Match of the Day (F)

While these type of productions are relatively small scale and often of a temporary nature, they still carry an element of construction risk and therefore need to be appropriately managed. To assist those who are planning to commission this type of project, the ΒιΆΉΤΌΕΔ has produced a CDM Planning Sheet template document. This simple document allows the user to document basic project details, detail the work required, list key personnel, highlight any identified health and safety considerations, and clarify any administration details. In terms of the CDM Regulations, this would be considered as the client producing pre construction information. This document should be shared with the contractor (s) and any potential designers involved.

Construction Managers, should use the contents of this document and design information provided by Designers to produce a (Construction Phase) Plan for the project 

The application of CDM to all three productions is discussed in greater detail in the Medium Construction Related Projects document  (Useful Documents Section)

Small Construction Related Tasks

Small construction related tasks would include areas such as putting together scenery β€˜flats’ (C) , changing a door, painting a wall (A) or installing new lighting in a room (B)

Whilst there is a level of construction risk involved with smaller activities, some jobs will literally take a few minutes to complete so it is not practical to put together paperwork that may take longer to produce than the job takes to complete. In these cases a simple safe system of work will suffice. For example putting together scenery or painting a wall may involve some potential work at height, how can this be avoided / done safely? Changing a door may involve some manual handling; installing lighting will involve working with electricity, think how these risks are going to be controlled? Remember CDM is about sensible risk control, not generating paperwork.

The application of CDM to all three productions is discussed in greater detail in the Small Construction Related Tasks document (Useful Documents Section)

'Grey' Areas

There will be occasions when it will not be that obvious as to which of the three categories of construction activities a particular project will fit into. On these occasions it will be down to the production team to decide where on the scale, their project lies and plan accordingly. The higher the potential risk the more planning required.  If production teams are unsure as what level of planning is required they should discuss their project with their Safety Advisor or speak to the Central Safety Team  

Construction Risk Management - The Golden Rules

Whatever the size of the construction project there are certain common elements that need to be in place to help secure the health and safety of all involved. The Golden Rules;

  • The right people and organisations are appointed at the right time.
  • Risks are avoided where possible. Where risks cannot be avoided they are evaluated and proportionate control measures are put in place at the source of the risk.
  • All involved in the project have the necessary information, instruction, training and supervision to enable them to work safely
  • Arrangements exist to ensure that all involved in the project cooperate and communicate with each other and coordinate their work.
  • Worker engagement is promoted throughout the project.
  • If in any doubt - Ask!

Premises and sets topics

  • Sets & Premises safety guide

    This Safety Guide collates those of our Safety Guidelines relating to construction activities (on sets or other structures, including under 'CDM') and to the occupation / use of building premises (studios or locations).
  • This site is for ΒιΆΉΤΌΕΔ Employees or potential future employees only. If you are not a ΒιΆΉΤΌΕΔ employee or looking for further information regarding ΒιΆΉΤΌΕΔ Access Services then please click on another page from the menu above, where you can find out more about Remploy.
  • Asbestos Management on ΒιΆΉΤΌΕΔ premises

    This is a summary of the way that asbestos is managed in ΒιΆΉΤΌΕΔ Buildings. It supplements the information about managing asbestos on productions.
  • CDM Overview

    Legislation to ensure the safe design and construction of structures was updated in April 2015, namely the Construction (Design and Management) Regulations 2015 (CDM 2015)
  • CDM 2015 - The ΒιΆΉΤΌΕΔ Approach

    Guidance on the practical application of the Construction (Design and Management) Regulations 2015 across the ΒιΆΉΤΌΕΔ
  • First Aid in ΒιΆΉΤΌΕΔ Premises

    This page describes how first aid is arranged in ΒιΆΉΤΌΕΔ premises. It supplements the guidance to first aid on productions. It is aimed at people who need to decide what provision to make for first aid on ΒιΆΉΤΌΕΔ premises. It also provides the arrangements and numbers for contacting ambulances and the National Central Control Room (NCCR).
  • Legionella in Premises: Control of

    This guidance provides an overview of how water systems are managed in premises to minimise the risks from the Legionella bacteria.
  • Permit to Work in ΒιΆΉΤΌΕΔ Buildings (Restricted Work)

    Some work in ΒιΆΉΤΌΕΔ buildings is restricted and you have to get permission, called a Permit To Work (PtW) to do it.
  • Pressure Systems

    A guide to pressure systems in buildings. Pressure Systems include all plant/systems that contain a β€˜relevant fluid’, defined as steam or gas under pressure and liquids under pressure which become gases upon release to the atmosphere, at a pressure greater than 0.5 bar (about 7psi) above atmospheric (except for steam). Around the ΒιΆΉΤΌΕΔ there are heating, fuel transfer, compressed gas and hydraulic systems used in program production, studios (e.g. Camera Peds), office and maintenance facilities.
  • Sets: Safety of

    This Safety Guideline is concerned with the construction and use of production sets and associated scenery used in studios and on locations.

More from SSR

  • Your platform to record accidents, risk assessments, assurance monitoring and inspections
  • Safety Equipment Stores

    Just one number to call: 020 3614 5155
  • ΒιΆΉΤΌΕΔ Safety Guidelines

    An A-Z of ΒιΆΉΤΌΕΔ's Health and Safety Guidelines
  • Safety Advice Line: 0370 411 0464 Email: safety@bbc.co.uk

About this site

This site describes what the ΒιΆΉΤΌΕΔ does in relation to managing its health, safety and security risks and is intended for those who work directly for the ΒιΆΉΤΌΕΔ.

It is not intended to provide instruction or guidance on how third parties should manage their risks. The ΒιΆΉΤΌΕΔ cannot be held liable for how this information is interpreted or used by third parties, nor provide any assurance that adopting it would provide any measure of legal compliance. More information

Some links on this site are only accessible when connected to the ΒιΆΉΤΌΕΔ network

Rebuild Page

The page will automatically reload. You may need to reload again if the build takes longer than expected.

Useful links

Theme toggler

Select a theme and theme mode and click "Load theme" to load in your theme combination.

Theme:
Theme Mode: