144 The Building Research Establishment: Week 2
A manager at the BRE accepted he made a fundamental omission when analysing test data.
A manager at the BRE accepted he made a fundamental omission when analysing test data. Tony Baker told the inquiry he failed to notice non-combustible magnesium oxide boards used in a test by the insulation manufacturer Celotex.
The inquiry also heard from David Jones of Herefordshire Building Control who produced a certificate which incorrectly stated Kingspan insulation was a material of βlimited combustibilityβ. This is the standard suggested for use on buildings over 18 metres in height. He admitted taking information at βface valueβ but told the inquiry he was misled by Kingspan.
Presenter / Producer: Kate Lamble
Producer: Sharon Hemans
Researcher: May Cameron
Studio Mix: Gareth Jones
Podcast
-
The Grenfell Tower Inquiry Podcast
A new 10-part series about the Grenfell Tower fire and why it happened